20 lines
652 B
Markdown
20 lines
652 B
Markdown
[Home](https://cityssm.github.io/sunrise-cms/)
|
|
•
|
|
[Help](https://cityssm.github.io/sunrise-cms/docs/)
|
|
|
|
# Contracts
|
|
|
|

|
|
|
|
Contracts track preneed [burial site](./burialSites.md) reservations,
|
|
and at-need burial site interments.
|
|
|
|
## Key Contract Fields
|
|
|
|
**End Date**<br />
|
|
When set, the end date is considered the date the contract no longer applies.
|
|
In the case of a preneed contract, an end date should be applied when the recipient passes
|
|
and is interred in the burial site.
|
|
In the case of an at-need contract, the end date should remain empty as long as the deceased
|
|
is interred in the burial site.
|